Evidence & editorial method
Trace the claim
to the source.
Primary references for the standards, operator terms and programme descriptions used in the field library.
How to read our numbers
Propagation calculations use simplified geometry and explicit assumptions. Comparison-table ranges are illustrative design envelopes, not sampled performance data or carrier guarantees. Cost drivers are qualitative because currency, civil works, equipment and negotiated service levels make generic price rankings unreliable.
Regulatory scope
Each regional note identifies a verification step. It does not replace the applicable ACMA or BNetzA document, site-specific approval or professional assessment. Operator contracts, national conditions and programme milestones can change after this edition's review date of 03 October 2026.
Official reference library
- ACMA · Satellites and space systems ↗
- BNetzA · Satellite earth stations ↗
- 3GPP · Study on NR support for NTN (TR 38.811) ↗
- ITU · Space services and coordination ↗
- Vocus · Australia Singapore Cable ↗
- ITU-T · Submarine cable design, G Supplement 41 ↗
- European Commission · Digital connectivity in Germany ↗
- NBN · Sky Muster Plus Premium explained ↗
- Starlink · Priority plans, performance and hardware ↗
- Starlink · SLA measurement and conditions ↗
- Starlink · Maritime service ↗
- ITU-R · Earth-space propagation, P.618 ↗
- ITU-R · Specific rain attenuation, P.838 ↗
- ESA · Electronic beam steering ↗
- Eutelsat · KONNECT VHTS at 2.7° East ↗
- ITU-T · Installed single-mode fibre testing, G.650.3 ↗
- NOAA · Space weather scales ↗
- CableLabs · DOCSIS 4.0 technology ↗
- CableLabs · Optional 3 GHz DOCSIS extension ↗
- SUBCO · INDIGO West ↗
- SUBCO · INDIGO Central ↗
- ESA · Eagle-1 QKD programme ↗
- EASA · Antennas on large aeroplanes ↗
- LoRa Alliance · Regional parameters ↗
- Australian Defence · Establishment of Space Command ↗
- European Commission · IRIS² secure connectivity ↗
- Microsoft Research · Hollow-core fibre research ↗
Corrections
If a specification or link has changed, submit an inquiry with the article title and the official replacement reference. Technical claims should be updated alongside their diagrams and worked examples.